Approx Mechanical Services Cost: $150 000
Bellingen Youth Centre – Bellingen NSW 2454
A government grant funded project, the new Bellinge Youth Centre shall serve as a hub for the Bellingen Shire’s youth to gain access to services not regularly offered in the area.
With a strong focus on sustainability cultered into the Bellingen Shire the mechanical services proposed and installed is a Mitsubishi Electric systems. A Heat Recovery system comprising of a single outdoor unit, and seven indoor units, along with a split cassette and split ducted system and also ducted toilet ventilation form the scope of mechanical services.
As with other projects under construction or completed, the use of a Heat Recovery system allows for both simultaneous heating and cooling if required at the time. This can provide significant reductions in energy use, hence conforming with community expectations.

Address: Unit 1, 24 Isles Drive, Coffs Harbour NSW 2450
Phone: (02) 6652 5366 | Email: info@alliedac.net