“Dear Allied Air Conditioning And Refrigeration Team,

Well done on a terrific job at 28 Gordon Street, Coffs Harbour. For a project that has an objective of reduced energy consumption and good indoor air quality with some seriously tight plant room layouts, you managed to provide a team that delivered a project well. As the building services design engineers it is our opinion that the HVAC installation exceeded our expectation for this building and is high standard of installation for the industry.

Often it is the small details that can be overlooked and comprise the performance and longevity, however the installation at 28 Gordon Street has been well executed with attention to detail on all areas including ductwork insulation, flexible duct mounting, carefully mounted FCU and safety tray, protection of refrigerant pipework and insulation, etc.

An outstanding effort has been put into the arrangement of the fan coil units and ducting in the on floor plant rooms. The appropriately and securely mounted equipment has been completed with good access to all parts for ongoing maintenance and serviceability, which is critical to longevity and indoor air quality. A project well done that you should be proud of. Your efforts on this project have been noted and we look forward to recommending Allied Air for future work.”

Yours sincerely,

 Tim Smead